Ramon Airport () , named after Ilan Ramon and Assaf Ramon and unofficially also known as Eilat-Ramon Airport, is an international airport located in the Timna Valley in southern Israel. Ramon Airport is the second busiest in Israel (after Ben Gurion Airport) and has replaced the Eilat Airport and Ovda Airport for civilian traffic. It also serves as the primary diversion airport in Israel.
The airport is located north of Eilat, next to Be'er Ora. Unlike the previous airport in Eilat, it has ample Airport apron space and a longer runway, which allows large aircraft to land and park. The airport was originally due to open in April 2017, but the opening was pushed back and the airport opened on January 21, 2019. The Irish low-cost carrier Ryanair inaugurated the first international flight service with a Boeing 737–800 from Poznan Airport, Poland, on March 4, 2019.
Removing the Eilat Airport from the city center was considered necessary for further development of Eilat, as it would allow, among other things, the construction of additional hotels close to the shoreline. It would also reduce noise pollution. The project is part of a larger plan to develop the city, which includes mega-projects such as moving the Port of Eilat to a location near the Jordanian border (for which removing the original airport is necessary), the Railway to Eilat, and upgrading the Arava Road.
The airport is named in memory of the first Israeli astronaut Ilan Ramon, who perished in the Space Shuttle Columbia disaster, and his son Assaf Ramon who died six years later when his F-16 fighter jet crashed in a training accident. Timna Airport, Israel deot. Transport, retrieved 28/04/2012
Construction was authorized on July 24, 2011, before advanced planning had been completed. The project's projected cost was ₪1.95 billion and it was funded partly by real estate revenue from selling the Eilat Airport's land. The planning budget, approved on May 6, 2010, was ₪56 million. There was a plan to make the airport a build-operate-transfer (BOT) project, but the Israel Airports Authority (IAA) objected, and the government authorized it to plan and oversee the project. Despite this, it was estimated that if the IAA took on the funding completely on its own, it would go bankrupt and default on its debts. Danya Cebus was selected to build the passenger terminal. The terminal was planned to feature a duty-free shop, a feature which was not present in Eilat Airport as Eilat Airport virtually only saw . Mer Group was selected to provide command and control for the airport, including CCTV and perimeter protection.
In May 2013, the cornerstone was laid in a ceremony attended by government officials and members of the Ramon family. Construction began two weeks later.
The first test flight and landing in the airport took place on September 5, 2017. In January 2019, Jordan objected to Israel's opening of the airport, arguing that operation of the airport threatens the kingdom's airspace.
Ovda Airport which was built as a military airbase and is still used for that purpose had become the main airport for international flights to Southern Israel in the 2010s, as the facilities at Eilat Airport did not allow for the operation of larger and heavier planes. After Eilat Ramon Airport opened, Ovda was closed to civilian traffic.
The airport features a runway and has eight remote-parking stands for large aircraft and nine for turboprop airplanes. The land area of the airport covers , and the main terminal building is . It has the world's tallest anti-missile fence tall and long.
The runway is unusually long for an airport aimed to handle only two million passengers per year, which is in part due to the easily available real estate in the desert surrounding the site and also allows it to serve as a diversion airport for all types of aircraft originally scheduled to fly into Ben Gurion Airport. This avoids the numerous issues that would occur if a flight originally scheduled to fly into TLV were re-routed outside of Israel.
|
|